top of page
DeveEnergy DAM

Catching issues early on 9E-series engines

Location

Nigeria

Market segment

Power generation

Equipment type

HD gas turbine

Equipment model

9E

Catching issues early on 9E-series engines

Our team has helped one of the Holding companies to avoid costly catastrophic failures of their gas turbines and make fact-based operational decisions to ensure a vital supply of electricity to local communities.

The Challange

A reliable power supply is vital for the Nigerian economy and with economical and logistical constraints unplanned maintenance events have a noticeable impact on the livelihood of the local communities and their economy. To minimize those risks, our Client was seeking a partner who can deliver the borescope inspections and follow-up technical review to the multiple engines spread across the country.

The Results

DeveEnergy has deployed the dedicated team to perform the inspection and utilized our in-house engineering resources to provide a detailed technical assessment of the findings and recovery guidelines and plans, where required, within hours of completing each engine inspection. We have ensured that our team deployed for the project was supporting it from the beginning to the end, providing additional reassurance of consistency and understanding of the condition of the engines.

Project information

Location

Nigeria

Market segment

Power generation

Equipment type

HD gas turbine

Equipment model

9E

Our team has helped one of the Holding companies to avoid costly catastrophic failures of their gas turbines and make fact-based operational decisions to ensure a vital supply of electricity to local communities.

The Challange

A reliable power supply is vital for the Nigerian economy and with economical and logistical constraints unplanned maintenance events have a noticeable impact on the livelihood of the local communities and their economy. To minimize those risks, our Client was seeking a partner who can deliver the borescope inspections and follow-up technical review to the multiple engines spread across the country.

The Results

DeveEnergy has deployed the dedicated team to perform the inspection and utilized our in-house engineering resources to provide a detailed technical assessment of the findings and recovery guidelines and plans, where required, within hours of completing each engine inspection. We have ensured that our team deployed for the project was supporting it from the beginning to the end, providing additional reassurance of consistency and understanding of the condition of the engines.

15+

Engines inspected

4+

Sites visited

Single

Mobilization event

Plan your next project with DeveEnergy

bottom of page